PURCHASE · GRN
GRN / Material Receipt
Draft → Verify split (accepted/rejected/damaged = received) → Post to stock. Posting writes the Phase-2 ledger.
GRNs come from POs via → GRN (manual add in Phase 4 scope)
0
Draft
0
Verified
0
Posted
0
Accepted units
Loading demo data…
Page 1 of 1